Construction Progress Reports

What have we completed and what's next?

What's been happening?

Both the main terminal building with new check-in hall and first floor retail precinct, together with the Air New Zealand Regional Lounge were completed and opened, new rental car and other travel service outlets have opened for both domestic and international passengers and a new domestic baggage reclaim area has also now opened. Most recently the first stage of the new domestic jet arrivals and departures lounge has opened and operation of three dual-purpose airbridges, or "Swing Gates", for domestic or international passengers has commenced.

What's next?

The proposed timeline for construction is as follows:

Mid-Late 2012

  • The remainder of the domestic jet arrivals and departures lounge is completed
  • This departure lounge will include a cafe and retail outlets
  • A 600sqm restaurant and bar opens on Level 1 on the 7th of November.  This is located next to the domestic arrivals doors.
  • The second half of the departures lounge for domestic jet passengers, past security screening, will be opening early December.
  • Demolition of the last piece of the old terminal will start in December after the opening of the departures lounge.

Early 2013

  • Completion of aircraft parking works on the airfield
  • Once the last piece of the terminal has been removed in December / January we will commence the last of our building projects - 2 new airbridges.